After gathering ideas over the weekend, the today’s session was all about designing and developing our project concepts. To optimize this process, we divided the day into three phases:

Phase 1: Preparations

Each Team discussed their project proposals and wrote them down for a following presentation. Together we gave some advice and tried to help finding proper projects.

Image

Fully automated ventilator

Image

Physical dropbox

Phase 2: Brainstorming

After succeeding in picking the best project concept each team started to brainstorm and develop their ideas. Therefore we formed larger groups and helped each other. After lunch we presented our results as you can see in the following pictures.

Image

Team 1: Midi toaster

Image

Team 2: DJ Teddy

Image

Team 3: Walkman remote

Image

Team 4: The oscillograph

Image

Team 5: Physical Dropbox

Image

Team 6: The unnamed orb

Phase 3: Technical aspects

At the beginning of phase 3 we got a first look at the lab. That helped us to figure out what we are able to build from the technical point of view and if we need to order some additional pieces. Finally the long-awaited moment came, the teams started to construct the first parts of their project.

ImageImageImage